Factory & Industrial Automation

 
 

<UNDISCLOSED> SOuthern california Water District
SCADA System Upgrade

The Water District services 18+ million residents of Southern California and is the largest distributor of treated water in the country. SCADA System Upgrade includes systems engineering, equipment design, software development, commissioning, and support services for 6 water filtration plants and approximately 300 remote sites. 

Our engineers designed the latest generation of Remote Telemetry Hardened Nodes with redundant solid-state drives and can withstand operating temperatures up to 60C. Responsible for software installation and configuration, hardware design and manufacturing, retrofit kits, integration and support of SCADA software. 

<UNDisclosed> SOuthern california Agency
Pumped Storage Hydroeletric Plant SCADA System

This Pumped Storage Hydroelectric Power Plant consists of six 250 Megawatt turbines / pumps providing power to the county during peak use periods. 

Responsible for software installation and configuration, on-site installation and commissioning, and the system design to meet NERC CIP Version 6 for critical cyber asset infrastructures.

<UNDisclosed> AGENCY
River Power Plant Control System Upgrade

The client manages 6 power plants along the upper-portion of the river controlling 36 generators and producing 1,832MW. 

Our engineers worked closely with personnel to upgrade from Allen Bradley PLC5 to ControlLogix PLCs, SCADA system design, specifying SCADA hardware server requirements, software installation and configuration, and on-site commissioning for the first 2 of 6 power plants. 

<UNDISCLOSED> SOuthern california Water District
Water and Wastewater SCADA System Upgrade

The Water District services 134,000 people with 2 water treatment plants, 18 wells, 80 tanks, and 60 pumping stations while treating 7.5mgd at 3 sewer treatment plants. 

Responsible for specifying SCADA hardware server requirements, software installation and configuration, and on-site commissioning.

<UNDISCLOSED> EAST COAST Water District

Since 1931, the Water District has been providing residents from 9 deep underground wells and approximately 148 miles of water mains. 

Responsible for specifying SCADA hardware server requirements, software installation and configuration, and remote off-site commissioning.

<UNDISCLOSED> EAST COAST Water District 

One of the oldest water districts on Long Island, the Water District distributes 11,000gpm from 8 wells on 5 pumping sites to 8,800 accounts. 

Responsible for specifying SCADA hardware server requirements, software installation and configuration, and remote off-site commissioning.

<UNDISCLOSED> East COAST Water AUTHORITY

Founded in 1951, the Water Authority services 1.2 million residents and is the largest groundwater supplier in the country. 

Responsible for specifying SCADA hardware server requirements, software installation and configuration, and remote off-site commissioning.

<UNDisclosed> SOuthern california Public Works
Wastewater SCADA System Upgrade 

The Pump Maintenance (Wastewater Division) utilizes SCADA to control, monitor, and perform routine maintenance to 14 sewer lift stations, marine life support systems, four fountains, ponds, the heating and water treatment systems of two public pools and all the City's Parks irrigation pumps. 

Responsible for specifying SCADA hardware server requirements, software installation and configuration, and on-site installation and commissioning.